# Asana Task Link Macro

To setup **Asana Task Link** macro, go to your desired task in Asana.

Click on the task and copy the link.

<figure><img src="/files/nXzuBikNWvP5OTNlLn6d" alt=""><figcaption></figcaption></figure>

Paste the link in Confluence and it will be automatically converted to a macro.

<div align="left"><figure><img src="/files/nPnOaalQ6HmBkku7Zc8P" alt="" width="375"><figcaption></figcaption></figure></div>

You can also insert the macro manually by typing **/asana**.&#x20;

Select **Asana Task Link**.

<div align="left"><figure><img src="/files/iVIplnAxaaBFto1Jq6Jv" alt="" width="375"><figcaption></figcaption></figure></div>

Insert the copied url in the Asana Link text box and click Insert.

<div align="left"><figure><img src="/files/U3QQL8XZYfI3gsASwR86" alt=""><figcaption></figcaption></figure></div>


---

# Agent Instructions: Querying This Documentation

If you need additional information that is not directly available in this page, you can query the documentation dynamically by asking a question.

Perform an HTTP GET request on the current page URL with the `ask` query parameter:

```
GET https://docs.mybytes.tech/atlassian-cloud/asana-integration-for-confluence/user-guide/asana-task-link-macro.md?ask=<question>
```

The question should be specific, self-contained, and written in natural language.
The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.
